Windows 10: Why do taskbar buttons change order when switching between desktops?

Discus and support Why do taskbar buttons change order when switching between desktops? in Windows 10 Customization to solve the problem; When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps... Discussion in 'Windows 10 Customization' started by Wesley Werner, Nov 7, 2023.

  1. Why do taskbar buttons change order when switching between desktops?


    When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps to reproduce:1 Press winkey+tab and create a second desktop2 Open three different applications outlook, calc, browser3 Reorder the taskbar buttons by dragging them around4 Switch to the other desktop, then switch back5 Observe the button order revertedAllowing the user to reorder the taskbar buttons is intended to facilitate a workflow: By using the winkey+1/2/3/4/5 key combination it allows rapid switching. The user is also able to group

    :)
     
    Wesley Werner, Nov 7, 2023
    #1
  2. hfr_154 Win User

    After virtual desktop switch, taskbar buttons are rearranged!

    Same issue reported December, 2019:

    Redirecting

    But the issue still occurs 2023... Setting the group policy mentioned in above thread didn't solve the issue.

    Using Virtual Desktop for a short time only, the first one/two weeks it was perfect, no rearrangement of the taskbar buttons happend, but now it does... and it's annoying and makes the cool feature "Virtual Desktop" less user-friendly...

    How to prevent the arrangement of the taskbar buttons when switching between virtual desktops?

    At least workarounds are available: Windows 10 virtual desktops - preserve taskbar order

    But wondering that Microsoft was not able to fix this within 8(!) years...
     
    hfr_154, Nov 7, 2023
    #2
  3. MoHaMaD_T Win User
    After the desktop switch, the taskbar buttons are rearranged

    Hi

    I've one monitor and two desktops, that usually switch between them.

    But when I back to previous desktop, the taskbar buttons are rearranged and sorted differently from what I made.

    Is there any option to keep the previous order of buttons?

    EDIT:

    Actually I mean switching between desktops by (ctrl+win+→) or (ctrl+win+←)


    Why do taskbar buttons change order when switching between desktops? 08f816fe-4b9d-453a-a2b5-2faee98c18fc?upload=true.jpg
     
    MoHaMaD_T, Nov 7, 2023
    #3
  4. Thanatica Win User

    Why do taskbar buttons change order when switching between desktops?

    Windows won't keep taskbar button order

    I want my taskbar buttons to be ordered in the way that I put them there. I don't do that because I like doing it, but because I work that way. I don't feel like explaining why. I just want a particular order.

    Now why des Windows feel the need to reorder my buttons??

    Every time, FULLY reproducible, every time I switch to a different virtual desktop and back, the taskbar buttons are reset to some arbitrary default order.

    This is a bug in Windows. Microsoft, please fix this. You're ignoring a user's action you're allowing in the first place. If you can't keep order, don't provide reordering. If you provide reordering, keep the order as the user decides.

    Taskbar buttons are set to only display buttons for the current desktop. So virtual desktop #2 has different buttons than virtual desktop #1. I also have 2 screens (above each other). The same goes there: taskbar buttons are shown for the windows that are
    on each particular desktop only.

    Again, 100% reproducible.

    Everything is up-to-date. Mainstream releases only. No 3rd party window management. Only StartIsBack++, which doesn't concern itself with button placement.
     
    Thanatica, Nov 7, 2023
    #4
Thema:

Why do taskbar buttons change order when switching between desktops?

Loading...
  1. Why do taskbar buttons change order when switching between desktops? - Similar Threads - Why taskbar buttons

  2. Taskbar icons not showing when switching between desktop workspaces

    in Windows 10 Gaming
    Taskbar icons not showing when switching between desktop workspaces: Hello,I am having a problem where the taskbar icons are disappearing/not showing when I switch from one desktop workspace to another. The icons re-appear once the program is re-opened....
  3. Taskbar icons not showing when switching between desktop workspaces

    in Windows 10 Software and Apps
    Taskbar icons not showing when switching between desktop workspaces: Hello,I am having a problem where the taskbar icons are disappearing/not showing when I switch from one desktop workspace to another. The icons re-appear once the program is re-opened....
  4. Why does wallpaper keep changing from Slideshow to Picture when switching between desktops?

    in Windows 10 Software and Apps
    Why does wallpaper keep changing from Slideshow to Picture when switching between desktops?: Right after the latest update, the wallpaper settings keep changing from Slideshow to Picture on its own when I switch between desktops. I have never encountered this problem before....
  5. Why do taskbar buttons change order when switching between desktops?

    in Windows 10 Gaming
    Why do taskbar buttons change order when switching between desktops?: When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps to reproduce:1 Press winkey+tab and create a second desktop2 Open three different applications outlook, calc, browser3...
  6. Why do taskbar buttons change order when switching between desktops?

    in Windows 10 Software and Apps
    Why do taskbar buttons change order when switching between desktops?: When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps to reproduce:1 Press winkey+tab and create a second desktop2 Open three different applications outlook, calc, browser3...
  7. Desktop and taskbar refreshing when switching between apps.win11 latest update

    in Windows 10 Gaming
    Desktop and taskbar refreshing when switching between apps.win11 latest update: Desktop and taskbar refreshing when switching between apps.win11 latest update. I think it's happening from the last update. If I restart my laptop it becomes normal. But after I turn on my laptop from shutdown mode problem comes again . Any one pls help me....
  8. Desktop and taskbar refreshing when switching between apps.win11 latest update

    in Windows 10 Software and Apps
    Desktop and taskbar refreshing when switching between apps.win11 latest update: Desktop and taskbar refreshing when switching between apps.win11 latest update. I think it's happening from the last update. If I restart my laptop it becomes normal. But after I turn on my laptop from shutdown mode problem comes again . Any one pls help me....
  9. After the desktop switch, the taskbar buttons are rearranged

    in Windows 10 Customization
    After the desktop switch, the taskbar buttons are rearranged: Hi I've one monitor and two desktops, that usually switch between them. But when I back to previous desktop, the taskbar buttons are rearranged and sorted differently from what I made. Is there any option to keep the previous order of buttons?...
  10. Taskbar Icons Re-arrange when switching between Desktop views

    in Windows 10 Support
    Taskbar Icons Re-arrange when switching between Desktop views: Windows 10 Home 64-bit (10.0, Build 10586) - Clean Install with New Machine I just recently started using Windows 10 Multi-Desktop feature inside of the Task View. I organize my taskbar icons(pinned/running) for each desktop. When I switch desktops the Icons will...