Windows 10: Why do taskbar buttons change order when switching between desktops?
Discus and support Why do taskbar buttons change order when switching between desktops? in Windows 10 Gaming to solve the problem; When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps... Discussion in 'Windows 10 Gaming' started by Wesley Werner, Nov 7, 2023.
Thema:
Why do taskbar buttons change order when switching between desktops?
Loading...
-
Why do taskbar buttons change order when switching between desktops? - Similar Threads - Why taskbar buttons
-
Taskbar icons not showing when switching between desktop workspaces
in Windows 10 GamingTaskbar icons not showing when switching between desktop workspaces: Hello,I am having a problem where the taskbar icons are disappearing/not showing when I switch from one desktop workspace to another. The icons re-appear once the program is re-opened.... -
Taskbar icons not showing when switching between desktop workspaces
in Windows 10 Software and AppsTaskbar icons not showing when switching between desktop workspaces: Hello,I am having a problem where the taskbar icons are disappearing/not showing when I switch from one desktop workspace to another. The icons re-appear once the program is re-opened.... -
Why does wallpaper keep changing from Slideshow to Picture when switching between desktops?
in Windows 10 Software and AppsWhy does wallpaper keep changing from Slideshow to Picture when switching between desktops?: Right after the latest update, the wallpaper settings keep changing from Slideshow to Picture on its own when I switch between desktops. I have never encountered this problem before.... -
Why do taskbar buttons change order when switching between desktops?
in Windows 10 Software and AppsWhy do taskbar buttons change order when switching between desktops?: When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps to reproduce:1 Press winkey+tab and create a second desktop2 Open three different applications outlook, calc, browser3... -
Why do taskbar buttons change order when switching between desktops?
in Windows 10 CustomizationWhy do taskbar buttons change order when switching between desktops?: When switching between virtual desktops, the order of taskbar buttons revert to some previous state. This is a user experience failure and a bug.Steps to reproduce:1 Press winkey+tab and create a second desktop2 Open three different applications outlook, calc, browser3... -
Desktop and taskbar refreshing when switching between apps.win11 latest update
in Windows 10 GamingDesktop and taskbar refreshing when switching between apps.win11 latest update: Desktop and taskbar refreshing when switching between apps.win11 latest update. I think it's happening from the last update. If I restart my laptop it becomes normal. But after I turn on my laptop from shutdown mode problem comes again . Any one pls help me.... -
Desktop and taskbar refreshing when switching between apps.win11 latest update
in Windows 10 Software and AppsDesktop and taskbar refreshing when switching between apps.win11 latest update: Desktop and taskbar refreshing when switching between apps.win11 latest update. I think it's happening from the last update. If I restart my laptop it becomes normal. But after I turn on my laptop from shutdown mode problem comes again . Any one pls help me.... -
After the desktop switch, the taskbar buttons are rearranged
in Windows 10 CustomizationAfter the desktop switch, the taskbar buttons are rearranged: Hi I've one monitor and two desktops, that usually switch between them. But when I back to previous desktop, the taskbar buttons are rearranged and sorted differently from what I made. Is there any option to keep the previous order of buttons?... -
Taskbar Icons Re-arrange when switching between Desktop views
in Windows 10 SupportTaskbar Icons Re-arrange when switching between Desktop views: Windows 10 Home 64-bit (10.0, Build 10586) - Clean Install with New Machine I just recently started using Windows 10 Multi-Desktop feature inside of the Task View. I organize my taskbar icons(pinned/running) for each desktop. When I switch desktops the Icons will...