Windows 10: How to change order of users on Windows logon screen
Discus and support How to change order of users on Windows logon screen in User Accounts and Family Safety to solve the problem; I have three users (all with local accounts) on my PC and some time ago I disabled the auto-login using the process described here: Solved Help with... Discussion in 'User Accounts and Family Safety' started by OpenWindows, Mar 15, 2016.
Thema:
How to change order of users on Windows logon screen
Loading...
-
How to change order of users on Windows logon screen - Similar Threads - change order users
-
How to switch user at logon screen in windows 10
in Windows Hello & LockscreenHow to switch user at logon screen in windows 10: Dear Microsoft, My default login user was disabled so I can't login to my laptop anymore. I have built-in Administrator enabled, but I have no idea how to change my default user sign-in at logon screen. There is only show the password entry field and no switch user options... -
Change logon screen user name
in Windows 10 CustomizationChange logon screen user name: My Huawei Matebook D14 had a major problem fixed under warranty but involved reformat or replacement of SSD and reinstallation of Windows 10 Home. All OK now except that the user name is Huawei instead of my name. I would like to correct this. Presume that it needs editing of... -
Other User on logon screen
in Windows Hello & LockscreenOther User on logon screen: Hi, the laptop given to me by my school suddenly started saying other user on logon, I am not the administrator is there anyway to fix this? https://answers.microsoft.com/en-us/windows/forum/all/other-user-on-logon-screen/dbadf391-f7b2-44a2-aef4-dd4257875d3a -
Shortcut to change user on logon screen?
in Windows 10 Ask InsiderShortcut to change user on logon screen?: Is there a keyboard shortcut to change from an user to another on the logon screen? submitted by /u/filmol [link] [comments] https://www.reddit.com/r/Windows10/comments/f6scf4/shortcut_to_change_user_on_logon_screen/ -
How to show user logon screen with switch user by default?
in Windows Hello & LockscreenHow to show user logon screen with switch user by default?: Hello, I've added another user to my pc but I want my user to be on by default and show this screen anytime a logon is required (with the Switch User button): (not my picture) [ATTACH] Thanks, Harry... -
Change log in user order
in User Accounts and Family SafetyChange log in user order: I just gave my wife my old laptop, she has an account on this machine. The problem is when you boot up it logs into my account first. I want to change the login order so it logs into her account first. How do you do this without deleting my account. My account is set up to... -
Change log in user order
in Windows 10 SupportChange log in user order: I just gave my wife my old laptop, she has an account on this machine. The problem is when you boot up it logs into my account first. I want to change the login order so it logs into her account first. How do you do this without deleting my account. My account is set up to... -
How to hide a user account from the logon screen?
in User Accounts and Family SafetyHow to hide a user account from the logon screen?: I'm trying to create a user account that I need to run some apps with using a remote connection. (The reason for a separate account is so that I can assign it a special set of permissions/privileges.) If I create just another user account, it shows up in the logon screen.... -
How to hide a user account from the logon screen?
in Windows 10 SupportHow to hide a user account from the logon screen?: I'm trying to create a user account that I need to run some apps with using a remote connection. (The reason for a separate account is so that I can assign it a special set of permissions/privileges.) If I create just another user account, it shows up in the logon screen....
Users found this page by searching for:
order of users on windows logon screen