Windows 10: MSCONFIG Boot Tab..change order
Discus and support MSCONFIG Boot Tab..change order in Windows 10 Support to solve the problem; In MSCONFIG Boot Tab is possible, change the order of the boot selection that appear when the system turns on ? Thank Hispa 168983 Discussion in 'Windows 10 Support' started by hispanico, Nov 23, 2020.
Thema:
MSCONFIG Boot Tab..change order
Loading...
-
MSCONFIG Boot Tab..change order - Similar Threads - MSCONFIG Boot Tab
-
The msconfig boot tab is empty, and I can't do safe boot
in Windows 10 Installation and UpgradeThe msconfig boot tab is empty, and I can't do safe boot: Hi, I do need some help. This problem started when I converted my disk from MBR to GPT using paragon partition manager. Basically, I wanna upgrade my win 10 to win 11. Apparently, the upgrade failed 0x800703ee. after reading many articles, I just try to solve the problem by... -
The msconfig boot tab is empty, and I can't do safe boot
in Windows 10 GamingThe msconfig boot tab is empty, and I can't do safe boot: Hi, I do need some help. This problem started when I converted my disk from MBR to GPT using paragon partition manager. Basically, I wanna upgrade my win 10 to win 11. Apparently, the upgrade failed 0x800703ee. after reading many articles, I just try to solve the problem by... -
The msconfig boot tab is empty, and I can't do safe boot
in Windows 10 Software and AppsThe msconfig boot tab is empty, and I can't do safe boot: Hi, I do need some help. This problem started when I converted my disk from MBR to GPT using paragon partition manager. Basically, I wanna upgrade my win 10 to win 11. Apparently, the upgrade failed 0x800703ee. after reading many articles, I just try to solve the problem by... -
msconfig boot tab changes - safe to remove item no longer on the system?
in Windows 10 Gamingmsconfig boot tab changes - safe to remove item no longer on the system?: I run Windows 7 and opensuse Linux.I had to remove Windows 10, it got to big,vand slow to start and run.So I deleted it’s partition.msconfig in Windows 7 boot still shows both OS’s. Windows 7 is set as default.In a multi boot system is it safe to delete the Windows 10 boot... -
msconfig boot tab changes - safe to remove item no longer on the system?
in Windows 10 Software and Appsmsconfig boot tab changes - safe to remove item no longer on the system?: I run Windows 7 and opensuse Linux.I had to remove Windows 10, it got to big,vand slow to start and run.So I deleted it’s partition.msconfig in Windows 7 boot still shows both OS’s. Windows 7 is set as default.In a multi boot system is it safe to delete the Windows 10 boot... -
how to change boot order
in Windows 10 Customizationhow to change boot order: Hi, I currently have 2 bootable windows 10 hdds, 1 on C drive, 1 on E drive, currently when i restart the comp it boots into E: with C: as a secondary, however i want it to be the other way around boot to C: with E: as secondary. I tried swicthing the sata cables but it still... -
Multiple copies of Windows 10 in MSCONFIG Boot tab
in Windows 10 SupportMultiple copies of Windows 10 in MSCONFIG Boot tab: For as long as I can remember the General tab in MSCONFIG always had the Selective Startup option checked with the Use original boot configuration not checked as follows. [img] When I check the Use original boot configuration option the default switches to Normal startup... -
Changing Boot Order
in Windows 10 SupportChanging Boot Order: Having found my way into the BIOS to change the boot order I am faced with 4 options. Which one do I select? I want the PC to call first on a USB Recovery Drive, created with Macrium Reflect. Should I go back to BIOS to make a note of the options and list them here, as I... -
No listing under MSConfig Boot tab / not sure what to do
in Windows 10 Installation and UpgradeNo listing under MSConfig Boot tab / not sure what to do: I recently upgraded my SSD from a 500 GB drive to a 1 TB drive. I cloned the drive with Arocnis True Image 2016. It seemed to work, but then it wouldn't boot up. I followed some instructions I found on another forum about how to repair the bcd (booting up using the Windows 10...